Upper Bhadra Project
Bangalore
About the Pipeline
Leela projects took over this complicated water & irrigation project. The requirement was to design and deliver steel pipes for the dam.

Infrastructure
Machinery & Equipments
- 5 no. 5T & 3T chain pulley block
- 1 no 32mm vertical magnetic drilling machine
- 1 no 25mm vertical magnetic drilling machine
- 10 nos. arc/TIG welding machines (3 phase)
- 6 nos arc/TIG welding machine (1 phase)
- 4 no. MIG welding machine
- 1 no. Plasma cutting machine
- 6 no. Pug cutting machine
- 1 no. 3hp air compressor
- Manual sheet cutting machine
- 1 no. hand fly press
- 10 no. gas cutting set
- Additonal Required Tools