PEB
Bangalore
About the Project
Leela Projects successfully completed the Pre-Engineered Building (PEB) framework for an industrial warehouse spanning 12,000 sq. ft.. This project required precision fabrication and structural efficiency to ensure a durable, cost-effective, and high-performance warehouse structure. The project was executed using 40MT of steel, meeting industry standards and delivered within the 3-month timeline.




Infrastructure
Machinery & Equipments
- 5 no. 5T & 3T chain pulley block
- 1 no 32mm vertical magnetic drilling machine
- 1 no 25mm vertical magnetic drilling machine
- 10 nos. arc/TIG welding machines (3 phase)
- 6 nos arc/TIG welding machine (1 phase)
- 4 no. MIG welding machine
- 1 no. Plasma cutting machine
- 6 no. Pug cutting machine
- 1 no. 3hp air compressor
- Manual sheet cutting machine
- 1 no. hand fly press
- 10 no. gas cutting set
- Additonal Required Tools